Viewing entries in
News Archive

1 Comment

Live Premiere at Building Site

With both interest and expectations high, 150 guests arrived to Sweden for a live demonstration of The Brunkeberg® System, where Lindner Group presented the benefits of Brunkeberg System and showcased the new installation equipment. During a live performance, guests could see how two people distribute and install 800 kg glass panels in less than 5 minutes per panel. 

1 Comment

Comment

Langendorf Transportation

We are proud to have Langendorf in Sweden live demonstration of Langendorf trailers for vertical prefab panel transportation. This enables safer faster offloading of glass panels, saving space and time on the worksite. It lowers the number of transports, carbon emissions and transport costs. 

Comment

Comment

Brunkeberg Demo at BAU 2015 EXHIBITION

As part of the BAU exhibition in Munich in January 2015, Brunkeberg held an open house at the Lindner Group main head office in Arnstorf, Germany to present the Brunkeberg System.

Featuring a live demonstration of panel installation at the full-scale mock-up, as well as a tour of the Lindner Group premises, the open house garnered great enthusiasm for our system.

Comment

Comment

World class productivity

This spring, The Brunkeberg® System was presented at series of invitation-only breakfast seminars hosted by Prolog in Stockholm, Gothenburg and Malmö. With a theme of “World-Class Productivity,” the seminars delved into the topic of innovation and productivity in the construction industry.

Reach out to Prolog consultants for more information on how the Brunkeberg System can be used to improve construction logistics, productivity and safety on your construction project. 

Comment

Comment

Tested according to Europoean Standards

The Brunkeberg® Curtain Wall system is designed and manufactured by Lindner Group, and extensively tested by the institute of Rosenheim in Germany according to European standards. First tests were conducted on a three story high external rig to rigorously test functionality in a range of climatic conditions. Subsequent tests were performed on a rig to verify structural deflections, security, acoustics, air tightness and water tightness.

  • Air tightness: up to 600 Pa - class A4 according EN 12152.
  • Water tightness: up to 600 Pa - Class R7 according EN 12154.
  • Resistance to wind load for wind pressure - 1550 Pa serviceability and 2325 Pa safety
  • Resistance to wind load for wind suction - 2030 Pa serviceability and 3045 Pa safety
Brunkeberg Tests

Comment

Comment

High speed lifting

We are happy to announce the collaboration with Köster-Heide for design and manufacturing of the high performance lifting equipment and winches used in The Brunkeberg® System.

Comment

Recladding without relocation

Comment

Recladding without relocation

Brunkeberg are introducing a new system for recladding of old curtain wall glass facades, including a climbing protective wall and a recycling system for dismounting the old curtain wall. Less disturbance of tenants and substantial reductions of time and costs.

Comment

Layher Premium Scaffolding Solutions

Comment

Layher Premium Scaffolding Solutions

Brunkeberg protective systems are designed in collaboration with Layher, ensuring global supply of economical standard scaffolding parts. Layher has been the world leader in scaffold innovation since being founded in 1945.

Comment

Comment

Presentation at the promotion of professor Klaus Lang

Professor Klaus Lang, the head of Lindner Group R&D was promoted to honorary professor of building innovations at the University of Rosenheim.

As part of the press conference, The Brunkeberg® System was presented as "Revolution in facade renovation - the self installing curtain wall". 

Comment

Comment

A Lean Construction STUDY

Brunkeberg is pleased to report that the 2009 development study on the The Brunkeberg® System was presented at the 17th annual conference of the International Group for Lean Construction (IGLC), held in Taipei, Taiwan 2009.  

Comment

Feasibility study

Comment

Feasibility study

Arup Facade Engineering in London are commissioned to perform a feasibility study of the Brunkeberg System™ for curtain wall installation, with a focus on buildability and marketability. Arup provides independent design, procurement and construction advice on all aspects of facades and building exteriors across the world.

Comment

Comment

AF Feasability Study

AF Consult of Sweden are commissioned to perform a feasibility study of the Brunkeberg System™ for curtain wall installation with a focus on mechanical engineering, structural design and process efficiency. 

AF Consult are global technical consultants with specialization in mechanical lifting equipment on buildings and industrial automation, two core competencies needed for the design of the unique Brunkeberg System™.

Comment